Snowy River Sprint 2022
28. 5. – 29. 5. 2022 • asphalt 235.80 km - (cancelled 111.20 km) • Other years
Stage results
1. leg | Time | Pos. | km/h s/km |
Overall | Pos. after |
SS2 Stony (10.00 km) | 6:39.7 | 31.
3. class C4 31. Australia Tarmac |
90.1 km/h 7.10 s/km |
6:39.7 | 31.
3. class C4 31. Australia Tarmac |
SS3 Monument (8.50 km) | 5:00.7 | 27.
3. class C4 27. Australia Tarmac |
101.8 km/h 6.21 s/km |
11:40.4 | 30.
3. class C4 30. Australia Tarmac |
SS4 Tucker Box (8.90 km) | 5:17.5 | 29.
3. class C4 29. Australia Tarmac |
100.9 km/h 6.09 s/km |
16:57.9 | 28.
3. class C4 28. Australia Tarmac |
SS5 Jonkers (10.00 km) | 5:13.6 | 25.
3. class C4 25. Australia Tarmac |
114.8 km/h 4.53 s/km |
22:11.5 | 27.
3. class C4 27. Australia Tarmac |
SS6 Tara 1 (8.30 km) | 5:34.3 | 27.
3. class C4 27. Australia Tarmac |
89.4 km/h 5.69 s/km |
27:45.8 | 28.
3. class C4 28. Australia Tarmac |
SS7 CFA Long (16.90 km) | 10:19.4 | 24.
3. class C4 24. Australia Tarmac |
98.2 km/h 6.63 s/km |
38:05.2 | 23.
3. class C4 23. Australia Tarmac |
SS8 Bete (8.00 km) | 5:12.2 | 30.
3. class C4 30. Australia Tarmac |
92.2 km/h 6.83 s/km |
43:17.4 | 22.
3. class C4 22. Australia Tarmac |
SS9 Ostlers (8.90 km) | 5:14.7 | 30.
3. class C4 30. Australia Tarmac |
101.8 km/h 7.49 s/km |
48:32.1 | 22.
3. class C4 22. Australia Tarmac |
SS10 Long Point (9.40 km) | 5:14.1 | 27.
3. class C4 27. Australia Tarmac |
107.7 km/h 6.67 s/km |
53:46.2 | 22.
3. class C4 22. Australia Tarmac |
SS11 Bolong (8.00 km) | 5:13.4 | 25.
3. class C4 25. Australia Tarmac |
91.9 km/h 6.84 s/km |
58:59.6 | 22.
3. class C4 22. Australia Tarmac |
SS12 Tara 2 (8.30 km) | 5:26.8 | 25.
3. class C4 25. Australia Tarmac |
91.4 km/h 6.59 s/km |
1:04:26.4 | 22.
3. class C4 22. Australia Tarmac |
2. leg | |||||
SS13 Buchan Short (16.90 km) | cancelled | ||||
SS14 Stony Long (19.40 km) | 11:13.6 | 26.
3. class C4 26. Australia Tarmac |
103.7 km/h 5.24 s/km |
1:15:40.0 | 23.
3. class C4 23. Australia Tarmac |
SS15 Ostlers Long (19.30 km) | cancelled | ||||
SS16 Tara 3 (8.30 km) | cancelled | ||||
SS17 Buchan Long (37.50 km) | cancelled | ||||
SS18 Orbost Long (29.20 km) | cancelled |